Nigerian Radioactive Waste and Spent Nuclear Fuel Management Regulations, 2023
Commencement stated as 23 November 2023, but the Regulations were only gazetted in April 2026.
Summary
S.I. No. 4 of 2026. Made under s.47 of the Nuclear Safety and Radiation Protection Act Cap N142 LFN 2004, commenced 23 November 2023 and gazetted 13 April 2026. Imposes direct environmental waste-management obligations on waste generators.
Key requirements
reg. 4: generators and operating organisations carry primary responsibility for the safety of radioactive waste and spent nuclear fuel they produce. regs. 5-7: integrated approach to safety and security, interdependence management and management system. regs. 8-11: minimise and control waste generation, characterise and classify waste, and control radioactive discharge. regs. 12-14: clearance of materials, processing of waste, and provision of interim storage consistent with the selected disposal option and the limits, conditions and controls established in the safety case and the environmental impact assessment. regs. 15-16: transfer of ownership and on-site and off-site transportation. regs. 17-19: treatment, conditioning and waste acceptance criteria. reg. 20: return of disused sealed radioactive sources. reg. 21: disposal of radioactive waste. regs. 22-24: preparation and assessment of safety measures, safety case documentation and periodic safety review. Dose ceiling: effective dose of 20 mSv averaged over five years for occupationally exposed workers and 1 mSv for members of the public.
In force from
Compliance deadline
Regulator
Impact
Sectors
- Energy
- Healthcare
- Extractives
- Manufacturing
Who it affects
- Energy
- Healthcare
- Oil and Gas
- Mining
- Utilities
Sources
Official and legal texts
- nnra.gov.ng (opens in a new tab)
- Federal Republic of Nigeria Official Gazette Vol. 113 No. 69, 13 April 2026 (S.I. No. 4 of 2026)